settings_phone Call back
Ufa, 48-36, Zapototsky Str., Ufa, Bashkortostan, Russia, 450015
Schedule:
from 9 a.m. - 9 p.m. seven days a week
settings_phone
place Ufa, 48-36, Zapototsky Str., Ufa, Bashkortostan, Russia, 450015
access_time Schedule: from 9 a.m. - 9 p.m. seven days a week
ru en

Detailed Design

Green Ray

Working Documentation Stage (WD)

At this stage, the Designer develops a complete package of documentation and drawings (working documentation), necessary and sufficient for all construction, installation, commissioning works in order to put the capital construction project into operation.

There are following sections of the Working Documentation (WD) in Russia:

  1. Structural and spatial planning solutions;
  2. Engineering equipment and networks – technological solutions;
  3. Power supply systems;
  4. Instrumentation and automation;
  5. Water supply system;
  6. Gas and fuel supply system ;
  7. Construction management plan, cost estimates;
  8. Environment;
  9. Fire safety;
  10. Requirements to ensure the safety of operation;
  11. Civil defense and emergencies; < / li>
  12. Energy efficiency.

Reference lists of Green Ray Ltd.'s employees on the performed work are posted on the "Qualifications and Experience" page of this site.

Customer reviews regarding the works performed by Green Ray Ltd. company's employees are posted on the "Feedback" page of this website.

Green Ray

Make a request